Links
Summarized
Field Sample Results
Facility
Analyte Level List
Return Links
Water
System Facilities
Water
System Detail
Water
Systems
Water
System Search
County Map
Glossary
|
Water System Facility Detail
Water System No. : |
IL0431200 |
Federal Type : |
C |
Water System Name : |
WOOD DALE |
State Type : |
C |
Principal County Served : |
DU PAGE |
Primary Source : |
SWP |
Status : |
A |
Activity Date : |
01-01-1961 |
|
State Asgn ID No. : |
WL20524 |
Type : |
WL |
Facility Name : |
WELL 5 (20524) EMER |
Activity Status : |
A |
Activity Reason
Text : |
OOS Feb - Mar 2024 for repairs per email status update. DMS
OOS Dec 2022 - Feb 2023 per email status update. DMS
OOS Jan - Feb 2022 per email status update. DMS
OOS Jan 2021 - Mar 2021. DMS
OOS Jan 2020 thru May 2020
OOS DEC 2018 thru MAR 2019
OOS DEC2017-MAR2018. MTB
OOS DEC2016-MAR2017. MTB
OOS DEC2015 through MAR2016. 12/2/15 email. MTB
11/18/2014: Shibu: Hi Jeri, Because the locations of these wells causes streets to flood during sampling causing hazardous conditions for residents, please remove the specified three wells from monthly sampling until April 2015. This facility has been on Lake Michigan water since early 90s and never used these wells other than for sampling purposes. The facility also has 2 days in elevated storage.JL
11/13/2013: Does not use well during winter months. JL
OOS DEC2011-FEB2012
Annually OOS NOV-MARCH (5/10/11 email exchange with Dave McMillan)
OOS DEC2010-APR2011
Cannot sample during winter. Per Dave McMillan, this system is exempt from bacteria monitoring on these wells for DEC2009, JAN2010, FEB2010, MARCH2010, Aprl2010
|
Activity Status
Date : |
01-01-1973 |
Sampling
Points
Sampling
Point |
Location |
Type |
WL20524 |
W5 KLEFSTAD INDL PK |
RW |
Annual Operating
Periods
Start Month |
Start Day |
End Month |
End Day |
Effective Begin Date |
Effective End Date |
|